Three-phase provisioning

Three-phase board conversions

Three-phase power splits demand across three conductors, which is what ducted air conditioning, larger workshops and fast EV charging want. Converting a home involves the network connection and metering on one side and the switchboard on the other, this service covers the board rebuild that makes three-phase usable.

Scope

What this covers

  • Three-phase chassis, main switch and distribution layout

  • Phase balancing of existing circuits across the new supply

  • Provision for three-phase appliances and future chargers

  • Coordination with the separately accredited crew handling the network connection and meter

Timing

When it's needed

If an appliance or charger specifies a three-phase supply, or the single-phase main keeps tripping under combined evening load, a conversion is on the table. The board work is sequenced after the network operator approves the new connection, so the application belongs at the start of the project.

A burning smell, buzzing, scorch marks or a warm panel at the switchboard are act-now signs: switch off what you safely can and get a licensed electrician onto it quickly. Never open the panel or pull fuses on the supply side yourself.

Quote variables

What shapes the scope

Switchboard work in NSW is licensed electrical work, check the contractor's NSW electrical licence before anything starts. Where a job crosses into mains or metering on the network side of the installation, that portion must be carried out under the state's accredited service provider scheme by someone holding the relevant accreditation, so ask how that boundary is being handled.

Upgrade services

Start your quote

Send through the job details and we'll connect you with a licensed provider who can quote this work.

If this is an emergency or anyone is at immediate risk, contact the relevant emergency service or your network or utility operator directly instead of using this form.